Digital Cost Planning for Real‑World Delivery.
Data‑driven cost planning and BIM‑enabled analysis to set realistic budgets and manage commercial risk on residential and mixed‑use projects in London and across the UK.
Early cost decisions
Data‑driven cost planning for projects where early choices lock in most of the spend.
Moving design
Structured budgets that keep pace with design development instead of static estimates.
Hidden exposure
Digital review of drawings and models to reveal where cost risk is building up over time.
Commercial baseline
A stable cost position that links into BIM Quantity Intelligence and Construction Cost Control.
Why Cost Plans
Drift Off Reality
Digital Cost Planning exists because most construction budgets are set too early, on too little information, and are not kept in line with how design and scope actually evolve on live schemes. This leaves later services like Construction Cost Control dealing with issues that could have been caught much earlier.

Digital Cost Planning Keeps
Budgets
Aligned with Design
We link cost planning directly to design development, using digital review of drawings, BIM models and scope so that budgets move with the scheme rather than lag behind it. Digital Cost Planning becomes the commercial thread that connects early feasibility, BIM Quantity Intelligence and later Construction Cost Control on residential and mixed‑use projects.
Structured, stage‑by‑stage cost planning
Cost plans are built and updated at each design stage, using consistent assumptions and data, rather than one‑off estimates that quickly go out of date.
Integration with BIM Quantity Intelligence
Quantities are checked against live BIM models, helping to spot scope drift, missing items and Late Design Changes before they become Hidden Cost Exposure.
Commercial insight before procurement
We highlight where cost, risk and value are out of balance so you can adjust scope, sequencing and procurement strategy before going to contractors.
Alignment with Construction Cost Control
The digital cost plan becomes the baseline for Construction Cost Control, making it easier to manage variations, track trends and explain decisions to the board.


Where Digital Cost Planning Makes the Biggest Difference
Digital Cost Planning is built for higher‑risk residential and mixed‑use schemes where scope, design and funding decisions need a defensible commercial baseline.



When Digital Cost Planning Adds Most Value
Digital Cost Planning works best when key commercial decisions are still open and the cost baseline can guide scope, design and procurement.
Reducing Silent Commercial Risk Before It Hits Site.
Digital Cost Planning is designed to pull risk out of assumptions and into clear numbers, so you see where cost, scope and programme are drifting before they turn into claims or budget shocks on live projects.



For Clients Who Carry the Commercial Risk
Digital Cost Planning is aimed at decision‑makers who own the budget and commercial risk on construction schemes, not at low‑fee estimating or one‑off QS quotes.
and project experience
A Senior, Independent and Digital‑First Way of Working
We work as an independent, digital‑first cost partner, using data, benchmarks and BIM to keep your cost plan close to real delivery.You always get senior attention and a clear commercial risk thread from early planning through procurement and live cost control.
Share a live scheme and we will show you how Digital Cost Planning can support your commercial decisions.
A Clear, Structured Cost‑Planning Process
We follow a straightforward four‑step process so that Digital Cost Planning slots neatly into your design, funding and procurement timelines rather than slowing them down.
Set Brief
Check Scope
Build Plan
Align Procurement
Digital Cost Planning – Frequently Asked Questions
Digital Cost Planning can feel abstract if you have only worked with traditional estimates, so these FAQs set out how the service works in practice, when to use it and what to expect.
How is Digital Cost Planning different from a QS estimate?
When should we bring Digital Cost Planning into a project?
Do we need a BIM model to use Digital Cost Planning?
How does Digital Cost Planning support Construction Cost Control later on?
Is Digital Cost Planning suitable for smaller or single‑building schemes?
How do you work alongside our internal commercial or contractor team?




Contact With Us!
Office 676,60 Tottenham Court Road,Fitzrovia,LondonW1T 2EW
Call us: 020 3576 2851
Email: office@reltic.co.uk
Copyright © 2026 Reltic Construction Consultants Ltd. All rights reserved.