BIM Quantity Intelligence for 3D, 4D and 5D Delivery
Model‑based 3D scope review, 4D sequencing insight and 5D quantity and cost checks to improve estimates, support Digital Cost Planning and reduce commercial risk on residential and mixed‑use projects
Better Quantities
Model‑checked quantities to reduce errors in estimates, procurement and cost planning.
3D Scope Insight
Use the BIM model to test scope clarity, coordination risk, constructability and design development.
4D Delivery Risk
Highlight where sequencing, access and programme logic could create delivery pressure.
5D Commercial Control
Structured quantity and cost data to support procurement, change control and final accounts.
When BIM Models Don’t Add Up
Many BIM models look complete but the quantities and delivery logic behind them are inconsistent, missing or based on rough parameters. That leaves cost plans, tenders and live decisions built on weak data and optimistic assumptions.
Share a live model and we will show you where quantity, delivery and cost risk sit.

Turning BIM Models into
Defensible Quantities
BIM Quantity Intelligence checks and structures your models so the quantities and 3D scope behind them can be trusted, not just assumed.
We reconcile model data with drawings, specs and Digital Cost Planning, giving you a clear commercial thread from design through Strategic Procurement and Construction Cost Control.
Send a current model and we will show you where quantity and cost risk sits.
Structured, model‑based quantities
We extract, clean and structure BIM quantities so they line up with how packages, procurement, valuations, forecasts and cost plans are actually built.
Cross‑checks against drawings and specs
We compare model quantities with 2D drawings and specifications to catch missing items, double‑counting and scope gaps before they hit tender.
Commercial insight before procurement
We highlight where model assumptions could create cost or programme risk, so you can address them before Strategic Procurement and contractor pricing.
Live link with cost
control
We keep a live connection between BIM quantities and your commercial baseline, supporting Construction Cost Control, Change & Variations and Final Accounts & Disputes.


Where BIM Quantity Intelligence Matters Most.
BIM Quantity Intelligence brings most value on projects where the commercial risk sits with the client team and where design, procurement and delivery all depend on reliable model‑based quantities.
We focus on schemes where BIM is already being used, but the quantity and cost information behind the models needs a more deliberate, defensible structure to support Digital Cost Planning, Strategic Procurement and Construction Cost Control.



When BIM Quantity Intelligence Matters Most
BIM Quantity Intelligence works best when quantity and cost decisions are still flexible, but models are already driving design and stakeholder expectations.
We focus on the stages where independent QS insight can use 3D, 4D and 5D BIM data to lock in realistic quantities, expose commercial risk and keep the cost story consistent from feasibility to final account.
Reducing Silent BIM Quantity Risk Before It Hits Site
BIM models often look coordinated on screen while the quantities behind them quietly drift away from what is being procured and built.
BIM Quantity Intelligence exposes these gaps early, so independent QS insight can challenge assumptions, stabilise quantities and protect your commercial position before contracts are signed.

Inaccurate Early Cost Assumptions
Scope Definition Risk


Clients Who Rely on BIM for Cost and Risk
BIM Quantity Intelligence is for clients and project teams who are accountable for the out‑turn cost, not just the design or the model.We work with people who already use BIM, but need independent QS insight to turn models into quantities that stand up to procurement, change control and final account discussions.
and project experience
A Senior, Independent and BIM‑Led Way of Working
BIM Quantity Intelligence is delivered by senior, independent cost and commercial advisors who sit between design, client and contractor teams, focused solely on commercial outcomes rather than selling software or design extras.
We work directly off your BIM environment, cost data and contracts, building defensible quantities that support funding, procurement, change control and final account – without taking sides in design or delivery.
Share a live BIM scheme and we will show you how BIM Quantity Intelligence can support your commercial decisions.
A Clear, Structured BIM‑Quantity Process
We follow a straightforward four‑step process so that BIM Quantity Intelligence slots neatly into your design, funding and procurement timelines rather than slowing them down.
Set Brief
Check Scope
Build Plan
Align Procurement
BIM Quantity Intelligence – Frequently Asked Questions
Quick answers to the most common questions about using BIM models for defensible quantities and commercial control.
How is BIM Quantity Intelligence different from a standard QS service?
When is the right moment to involve you?
Can you add value if our models are inconsistent or messy?
Do you replace our existing QS or cost consultant?
What tools and formats do you work with?
What does a typical first engagement look like?




Contact With Us!
Office 676,60 Tottenham Court Road,Fitzrovia,LondonW1T 2EW
Call us: 020 3576 2851
Email: office@reltic.co.uk
Copyright © 2026 Reltic Construction Consultants Ltd. All rights reserved.