Construction Cost Control for Live Projects
Construction Cost Control keeps BIM quantities, change records and cost reports aligned so you can manage variations, re‑base schemes and close out final accounts on consistent numbers.
Live Quantities
Quantities checked against what is actually happening on site, so valuations and cost reports are built on numbers you can stand over.
Aligned Scope
We use BIM and drawings to make sure contract scope, packages and what is being built all line up, reducing arguments about “what was included”.
Programme & Risk
We connect access, sequencing and programme change to their commercial impact, before they turn into delay claims or pressure on the final account.
Close‑Out Numbers
Quantity and cost data is structured so it supports day‑to‑day Construction Cost Control, Change & Variations, and a clean final account.
When Cost Control Doesn’t Match the Job
Many projects look under control on paper, but the quantities, change records and commercial logic behind them are fragmented or out of date. That leaves valuations, forecasts and final accounts built on weak data and optimistic assumptions.
Share a live project and we will show you where quantity, change and cost risk sit.
Turning Project Data into
Defensible Cost Control
Construction Cost Control pulls together BIM quantities, site measures, change logs and cost reports into one commercial view you can actually rely on. It sits alongside your Digital Cost Planning, Strategic Procurement and Change & Variations so decisions stay joined up from live works to final account.
Send a current project and we will show you where quantity, change and cost risk sit.
Structured, project‑based quantities
We clean and organise quantities so they match how contracts, packages and valuations are really being run on the job – not just how they sit in a spreadsheet.
Cross‑checks against drawings and change
We cross‑check quantities with drawings, instructions and change records to expose missing scope, overlaps and commercial grey areas before they hit negotiation.
Commercial insight before negotiation
We flag where assumptions, records or programme shifts could weaken your position, giving you time to tighten Construction Cost Control before re‑basing or final account.
Live link with
cost and risk
We keep a live connection between progress on site, quantities, Change & Variations and your commercial reporting, so cost control, risk and records stay in step.
Projects That Need Tight Cost Control
BIM Quantity Intelligence brings most value on projects where the commercial risk sits with the client team and where design, procurement and delivery all depend on reliable model‑based quantities.
We focus on schemes where BIM is already being used, but the quantity and cost information behind the models needs a more deliberate, defensible structure to support Digital Cost Planning, Strategic Procurement and Construction Cost Control.
When BIM Quantity Intelligence Matters Most
BIM Quantity Intelligence works best when quantity and cost decisions are still flexible, but models are already driving design and stakeholder expectations.
We focus on the stages where independent QS insight can use 3D, 4D and 5D BIM data to lock in realistic quantities, expose commercial risk and keep the cost story consistent from feasibility to final account.
Reducing Silent BIM Quantity Risk Before It Hits Site
BIM models often look coordinated on screen while the quantities behind them quietly drift away from what is being procured and built.
BIM Quantity Intelligence exposes these gaps early, so independent QS insight can challenge assumptions, stabilise quantities and protect your commercial position before contracts are signed.
Inaccurate Early Cost Assumptions
Scope Definition Risk
Clients Who Rely on BIM for Cost and Risk
BIM Quantity Intelligence is for clients and project teams who are accountable for the out‑turn cost, not just the design or the model.We work with people who already use BIM, but need independent QS insight to turn models into quantities that stand up to procurement, change control and final account discussions.
and project experience
A Senior, Independent and BIM‑Led Way of Working
BIM Quantity Intelligence is delivered by senior, independent cost and commercial advisors who sit between design, client and contractor teams, focused solely on commercial outcomes rather than selling software or design extras.
We work directly off your BIM environment, cost data and contracts, building defensible quantities that support funding, procurement, change control and final account – without taking sides in design or delivery.
Share a live BIM scheme and we will show you how BIM Quantity Intelligence can support your commercial decisions.
A Clear, Structured BIM‑Quantity Process
We follow a straightforward four‑step process so that BIM Quantity Intelligence slots neatly into your design, funding and procurement timelines rather than slowing them down.
Set Brief
Check Scope
Build Plan
Align Procurement
BIM Quantity Intelligence – Frequently Asked Questions
Quick answers to the most common questions about using BIM models for defensible quantities and commercial control.
