WHERE WE SIT ON A PROJECT

Between Design Team and Contractor. Always.

We sit outside the delivery team, appointed by the client or funder. No design mandate, no contractor relationship. One focus – the accuracy of the cost picture.

 

What are your needs?

The Gap No One Owns

Design teams focus on design. Contractors focus on margin. Without an independent eye on cost, the commercial picture reflects everyone's interest except yours.

A Position, Not a Service

We do not appear at tender and disappear at handover. We maintain a continuous, independent commercial presence from feasibility through to final account.

Live Cost Intelligence

We attend design reviews to identify uncosted scope. We verify contractor valuations. We track and price changes before they become contractual problems.

Across Every Stage

Feasibility, procurement, construction, final account. We are engaged where the commercial risk is highest - on [high-end residential, mixed-use and phased schemes.

Our Approach

What Independence Means
in Practice

We read across the full model and drawing set. We identify where scope has been assumed rather than defined. We produce a cost picture that client, contractor and funder can all work from – independently verified, consistently maintained.

Our Role

Independent cost oversight from the client side. We attend, review and report without a stake in the outcome of any design or procurement decision.

Our Method

Every valuation verified. Every change priced. Every position traceable to a model element, a drawing reference or a documented assumption.

Independent quantity surveyor reviewing contractor valuation and cost plan documents
Our Position

The Independent Commercial Eye on Every Stage of Your Project.

1 /%

Client-side only

1 /stages

Procurement, delivery, final account

1 /services

Feasibility to final account

1 /yrs

Senior-level experience

When quantities are established independently, traced to the model and documented from the start, the final account is not a negotiation. It is a reconciliation.
That is the difference between a cost plan that holds and one that does not.

Why It Matters

A Cost Plan Is Only as Good
as the Position It Was Built From.

When the person producing your cost data has no relationship with the contractor and no stake in the design, the numbers mean something different. They are not a negotiating position. They are a fact.

That is the difference between cost data that informs decisions and cost data that reflects interests. It is why independent quantity surveying matters from day one.

Our Commitment

Sitting Between Design and Contractor.
Always on Your Side.

› Every valuation independently verified
› Every scope gap identified before it becomes a claim
› Every cost position maintained from feasibility to final account

Work With Us

The Commercial Function Your Project Needs.
From Day One.

If your cost plan is built by someone with a stake in the outcome, it is not a cost plan. It is a position. We provide the independent alternative – traceable, auditable and defensible. See how this works across complex phasing projects and mixed-use developments.

Independent appointment - client and funder side only
Cost data verified against model, drawings and programme
Senior-level engagement across the full project lifecycle

Contact With Us!

Office 676,60 Tottenham Court Road,Fitzrovia,LondonW1T 2EW

Call us: 020 3576 2851

Email: office@reltic.co.uk

Subscribe Newsletter

    Subscribe to receive occasional insights and updates on construction, digital delivery and project strategy.

    Copyright © 2026 Reltic Construction Consultants Ltd. All rights reserved.