Working for One Side of the Table.
Yours.
We are appointed directly by the client, developer or funder. No stake in the outcome. No conflict of interest. Numbers that are independent, traceable and defensible.
What are your needs?
One Point of Truth
Most cost problems start with assumptions no one revisited. We establish a single, independent quantity picture - directly from the model, traceable to every element.
Numbers That Hold
We have no stake in the outcome and no relationship with the contractor or design team. Every figure we produce can be traced and defended under scrutiny.
Let's Talk Commercially
If your cost plan and the contractor's account no longer match, we want to know why. We will tell you what the numbers actually show - clearly, without commercial bias.
Across All Project Types
High-end residential, mixed-use, phased schemes, refurbishment. If the commercial risk is serious and the numbers need to be right, we know the territory and the work.
What Independence Means
in Practice
Reltic sits outside the delivery team. We have no interest in the contractor’s account and no relationship with the design team. Our only brief is to make sure the quantities, cost data and commercial decisions are correct – from feasibility to final account.
Our Position
Independent appointment, client and funder side only. No stake in the outcome of any negotiation or procurement process.
Our Standard
Every quantity traceable to a model element or drawing reference. Every figure capable of being defended under scrutiny.

The Standard for Independent Commercial Control across the UK.
Client-side only
Core services
Construction value advised
Senior-level experience
The Projects Where Independent Position Matters Most.
High-End ResidentialHigh-End Residential Projects
High‑value residential schemes need tight coordination between design intent, programme and commercial control.
Digital construction analysis gives early visibility of quantity assumptions, procurement exposure and delivery risks before construction begins.
Typical commercial pressures
- Complex coordination between multiple trades
- Programme constraints on tight, complex sites
- Cost plans based on incomplete design information
- Contractor pricing volatility
Complex Phasing Projects
Phased construction programmes need disciplined coordination between sequencing, access, logistics and commercial risk.
Digital construction analysis exposes assumptions, procurement exposure and delivery risks across phases before work starts.
Typical commercial pressures
- Programme instability across phased construction
- Site logistics constraints and delivery sequencing
- Coordination between contractors and trades
- Late-stage variation exposure across phases
Mixed-Use Developments
Mixed‑use developments demand precise coordination between different asset classes, programme logic and commercial control.
Digital construction analysis highlights cost, procurement and delivery risks across uses before construction begins.
Typical commercial pressures
- Coordination between retail, residential and other uses
- Programme sequencing where uses open at different times
- Procurement exposure across many specialist packages
- Cost planning complexity as value and spec vary by use
When quantities are established independently, traced to the model and documented from the start, the final account is not a negotiation. It is a reconciliation.
That is the difference between a cost plan that holds and one that does not.
Numbers That Cannot Be Challenged
Do Not Need to Be Defended.
When quantities are established independently, traced to the model and documented from the start, the final account is not a negotiation. It is a reconciliation.
That is the difference between a cost plan that holds and one that does not.
Building Cost Certainty.
Ensuring Commercial Control.
› Every quantity traceable to source
› Every change documented as it occurs
› Every position defensible under scrutiny
Independent Commercial Control. From First Cost Plan to Final Account.
If you need someone who will tell you what the numbers actually are – and stand behind them – that is what we do. We work on fewer projects, at senior level, with full engagement.




Contact With Us!
Office 676,60 Tottenham Court Road,Fitzrovia,LondonW1T 2EW
Call us: 020 3576 2851
Email: office@reltic.co.uk
Copyright © 2026 Reltic Construction Consultants Ltd. All rights reserved.